Customizing TMS ToolPanels: Best Practices and Tips

Migrating to TMS ToolPanels: Step-by-Step Implementation ChecklistMigrating to TMS ToolPanels can streamline translation management, centralize tools, and improve team productivity — but only if the migration is planned and executed carefully. This step-by-step implementation checklist walks you through preparation, migration, validation, and post-migration optimization so your move is smooth, low-risk, and delivers the expected benefits.


Before you begin: define scope and objectives

Start by clarifying why you’re migrating and what success looks like.

  • Define goals: Reduce turnaround time, improve terminology consistency, centralize plugins, or support new file types.
  • Determine scope: Which projects, languages, and teams will move? Will you migrate all historical projects or only active ones?
  • Identify stakeholders: Product owners, localization managers, translators, developers, IT, and QA. Assign a migration lead.
  • Set timeline and budget: Include buffer time for testing, training, and unforeseen issues.

Step 1 — Audit current TMS and Tooling

A thorough audit prevents surprises and highlights customizations that require attention.

  • Inventory projects, file types, and language pairs.
  • List all ToolPanels, plugins, scripts, and connectors in use.
  • Catalog translation memories (TMs), glossaries/terminology databases, and machine translation (MT) integrations.
  • Note user roles and permission models.
  • Record performance baseline metrics (throughput, average turnaround time, error rates).

Step 2 — Map features and gaps

Compare current capabilities with TMS ToolPanels to identify gaps and migration complexity.

  • Map each existing ToolPanel or plugin to its TMS ToolPanels equivalent.
  • Flag features that are missing, require custom development, or need third-party integrations.
  • Prioritize critical functionality (e.g., core MT, QA checks, TM leverage) versus optional conveniences.

Step 3 — Plan data migration strategy

Decide what to migrate, how, and in what order.

  • Choose between full historical migration, partial migration (active projects only), or hybrid (recent history + important TMs).
  • Plan TM and glossary migration: export formats, deduplication rules, and normalization (character encodings, placeholders).
  • Determine folder/project structure in the new TMS ToolPanels.
  • Create a rollback plan and backups for all exported assets.

Step 4 — Prepare environment & integrations

Set up the destination environment and ensure all integrations are ready.

  • Provision user accounts and configure role-based permissions aligned with your audit.
  • Install or enable required ToolPanels, plugins, and connectors.
  • Configure MT engines, API keys, and rate limits.
  • Integrate with source control, CMS, or content pipelines (webhooks, REST APIs, file transfer).
  • Validate security settings and compliance requirements (encryption, access logs).

Step 5 — Cleanse and standardize data

Data quality is critical for TM reuse and QA accuracy.

  • Deduplicate and merge translation memories; normalize tags and placeholders.
  • Normalize terminology entries (preferred terms, variants, part-of-speech where applicable).
  • Clean up orphaned or obsolete projects and assets.
  • Run sample imports to check for encoding, tag, and segmentation issues.

Step 6 — Pilot migration

Use a small pilot to validate assumptions and workflows.

  • Select representative projects (varied file types, languages, and complexity).
  • Migrate TMs, glossaries, and ToolPanel configurations for the pilot.
  • Assign a cross-functional pilot team: translators, reviewers, PMs, and engineers.
  • Run end-to-end workflows: import, translate (including MT), QA, export, and publish.
  • Collect metrics and feedback: time-to-complete, TM match rates, UI issues, and integration errors.

Step 7 — Validate and troubleshoot

Address issues surfaced during the pilot before full rollout.

  • Fix mapping errors, tag mismatches, or placeholder problems.
  • Adjust segmentation and tokenization rules if TM leverage is suboptimal.
  • Fine-tune QA checks and customize ToolPanels to match user needs.
  • Update documentation and standard operating procedures based on pilot learnings.

Step 8 — Train users

Effective training reduces adoption friction.

  • Prepare role-specific training: translators, reviewers, PMs, developers.
  • Create quick-reference guides, recorded walkthroughs, and a migration FAQ.
  • Run live sessions and office hours during the first weeks post-migration.
  • Provide channels for reporting issues and feedback (ticketing, Slack, email).

Step 9 — Execute phased rollout

Roll out in phases to limit risk and manage workload.

  • Use a phased approach by team, project type, or language group.
  • Monitor KPIs for each phase: throughput, TM utilization, error rates, and user satisfaction.
  • Pause the rollout if critical issues arise; implement fixes and re-test before continuing.
  • Maintain parallel processing where necessary (old TMS + new ToolPanels) until confidence grows.

Step 10 — Post-migration optimization

After the switch, continuously improve the setup.

  • Analyze TM leverage and adjust segmentation or TM thresholds for better efficiency.
  • Refine ToolPanel configurations and automate repetitive tasks with macros or scripts.
  • Conduct periodic audits to retire unused assets and keep glossaries current.
  • Gather ongoing user feedback and track ROI against initial goals.

Checklist (Quick reference)

  • Goals, scope, stakeholders defined
  • Inventory of projects, ToolPanels, TMs, glossaries completed
  • Migration plan, rollback strategy, and timeline created
  • Destination environment provisioned and integrations configured
  • Data cleaned, normalized, and sample-tested
  • Pilot migration completed and issues resolved
  • User training delivered and support channels established
  • Phased rollout executed with monitoring
  • Post-migration optimization plan in place

Common pitfalls and how to avoid them

  • Underestimating data cleanup: allocate time and tools for normalization.
  • Skipping pilot testing: leads to costly rework.
  • Insufficient training: causes productivity drops and resistance.
  • Ignoring integrations: broken pipelines cause delays and data loss.

Migrating to TMS ToolPanels is a strategic move that pays off with better consistency, automation, and collaboration when done methodically. Follow the checklist, pilot thoroughly, and iterate based on real user feedback to ensure a successful implementation.